A state-of-the-art industrial processing complex engineered for high-precision metal manufacturing and streamlined logistics workflow. The facility seamlessly unifies two heavy-duty production halls with an elegant administrative wing, tailored for maximum efficiency, safety, and operational flow. Built on a resilient steel portal frame structure, the complex features energy-efficient thermal facade paneling, alongside top-tier roofing insulation (EverGuard TPO membrane and Rockwool Hardrock Max) to ensure long-term sustainability and performance.

Location

Stara Zagora

Year

2020

Type

Metal processing plant

Total Built-up area

1 664м²

AMENITIES AND LAYOUT

  • Production & Preparation Wing: Functional Layout: Two dedicated processing halls featuring direct commercial transport access along the western facade, equipped with 3 industrial sectional overhead doors for seamless loading and dispatch. Equipment & Logistics: Integrated 5-ton overhead bridge crane servicing raw material preparation, supported by zero-emission indoor logistics (electric forklifts, stackers, and walkie stackers with dry batteries).

  • Administrative & Welfare Block: Executive Offices: Dedicated executive suites for the Managing Director, Accounting, HR, and Production Operations. Employee Welfare: Breakroom and dining lounge, employee locker rooms, private restrooms, visitor amenities, maintenance rooms, and main electrical control room.

За проекта

KEY HIGHLIGHTS

  • ADVANCED INDUSTRIAL INTRALOGISTICS: High-capacity manufacturing hub featuring a 5-ton bridge crane and eco-friendly, low-noise electric transport equipment for smooth material handling.
  • UNCOMPROMISING FIRE SAFETY: High-level passive fire defense with EI 120 (Class A1) non-combustible mineral wool sandwich panels and EI 120 rated drywall interior partitions.
  • HIGH EFFICIENCY & WEATHER PROTECTION: Premium thermal envelope featuring EverGuard TPO membrane, Rockwool Hardrock Max insulation (100 mm), and VENUS 4 mm bituminous waterproofing under the concrete slab for superior energy management.