Industrial Building

RECONSTRUCTION AND EXTENSION OF PRODUCTION BUILDING NO. 8 INTO A LOGISTICS CENTER, GROCERY STORE, CATERING KITCHEN WITH CANTEEN, AND MEAT PROCESSING PLANT

Stara Zagora/ 2019

About the project

A large-scale reconstruction and extension project converting the unfinished Building No. 8 of the former DZU industrial estate into a modern multi-functional logistics and food-processing hub. The existing structure consists of a 5-story precast reinforced concrete frame (II 20 system) spanning from Level ±0.00 to Level +14.40. The project is executed in 6 distinct phases, combining a central logistics hub, a retail grocery store, a hot catering kitchen with a dining canteen, a meat cutting facility, and executive administrative spaces.

Location

Stara Zagora

Year

2019

Type

Industrial reconstruction and extension / Logistics & Food Processing Hub

Total Built-up area

14 045м²

AMENITIES AND LAYOUT

  • Level ±0.00 / Level +0.80: Main logistics floor, 13 cold storage rooms, 3 loading docks (2 climate-controlled and 1 equipped with charging points), receiving area, security, and covered parking.

  • Level +3.60: Public entrance, grocery store, open-air parking deck, driver lounge, offices, and chilled fish storage zone.

  • Level +7.20: Catering kitchen, dining canteen with VIP area, meat portioning/packaging hall, 14 cold storage rooms, packaging storage, sanitary locks, and female locker facilities.

  • Level +10.80: Administrative offices (commercial, accounting, HR departments, archives, server room) and male locker facilities.

  • Level +14.40: Executive offices, conference rooms, central control room, boiler plant, laundry facility for workwear, and an outdoor covered deck housing the main ammonia refrigeration plant.

За проекта

Project Information

PLOT AREA:
7 822 м²

TOTAL BUILT-UP AREA:
14 045 m²

STAFF CAPACITY:
55 (141 in final phase)

PARKING: 99